Instructions
Cladding sheets are normally mounted according to application drawings (engineering). Cladding sheets are mounted following a direction dictated by their location within the structure, and the dominant wind direction. A basic rule is that the overlapping (connection) trapezoid should be directed opposite to wind direction. In the case of KONTITHERM 10 panels, these should be marked as clockwise (R) or counter - clockwise (L) depending on their mounting direction, looking from the gutter to the ridge. R1000 panel is right (of clockwise) when the connecting trapezoid is located to the right of the panel cross section.
